Thank you for the update. I have a 2.7L Lariat ordered, but no build date yet. A couple of weeks ago, the scedule you uploaded showed "no availabilty" on 2.7L...Do you know if that is still the case?Order Bank Open/Close
Retail: Open
Stock: Open
Notes:
• Production weeks: 9/30 - 10/28.
• Scheduling for Raptor orders only.
• Dressing Period.
Limited Availability:
- 64S - Forged Capable Wheel Optional on Raptor.
![]()
![]()
My Ranger 2.7 Lariat went into production last Wednesday the 7th. Wonder how long it will take? I believe it is in Michigan factory .Thank you for the update. I have a 2.7L Lariat ordered, but no build date yet. A couple of weeks ago, the scedule you uploaded showed "no availabilty" on 2.7L...Do you know if that is still the case?
Thank you my friend! Later than I hoped for but none the less great to know. Im praying that mine is in the next batch!Order Bank Open/Close
Retail: Open
Stock: Open
Notes:
• Production weeks: 9/30 - 10/28.
• Scheduling for Raptor orders only.
• Dressing Period.
Limited Availability:
- 64S - Forged Capable Wheel Optional on Raptor.
![]()
![]()
Ordered Lariat July 30 and immediatly got order confirmation - but no production date - is that unusual ?Order Bank Open/Close
Retail: Open
Stock: Open
Notes:
• Production weeks: 9/30 - 10/28.
• Scheduling for Raptor orders only.
• Dressing Period.
Limited Availability:
- 64S - Forged Capable Wheel Optional on Raptor.
![]()
![]()
No you get a production date once it is scheduled for production. But there a few factors that go into that for your vehicle to get scheduled for productionOrdered Lariat July 30 and immediatly got order confirmation - but no production date - is that unusual ?
Great info, thanks for posting. Does this report mean that any orders placed after 8/15 (for production 9/30 to 10/28) would not make it into the prior production run of 9/2 to 9/23? Or is it more fluid based on orders and matching component availability for a given order? I placed my Lariat order 8/12 and wondering if it may make it into the September run. If not, considering the 'Raptor only' build 9/30 to 10/28, I'm looking at November build at the earliest.Order Bank Open/Close
Retail: Open
Stock: Open
Notes:
• Production weeks: 9/30 - 10/28.
• Scheduling for Raptor orders only.
• Dressing Period.
Limited Availability:
- 64S - Forged Capable Wheel Optional on Raptor.
![]()
![]()
Theres about 650 total unscheduled rangers currently, they dont seem to break out Raptor specific orders. Ranger order banks in general close end of month, Raptors closed beginning of this month. 25 announcement is in 2 weeks or so. Once they close standard Ranger orders, we will see the balance out. December they wont really build anything and with current scheduling in October it will be tight.So this looks like they’re still building RR orders in the bank?
gives me a little hope mine gets built and not changed to a 2025 (don’t want the extra $4-5k jump like the broncos did)
All Rangers are made in the Michigan factory. Normally see 2-4 days for building. From what I understand the Production status you see is masking several internal status's so it may sit in that status for a bit after its built.My Ranger 2.7 Lariat went into production last Wednesday the 7th. Wonder how long it will take? I believe it is in Michigan factory .
For that specific week, its Raptor only. The schedule only shows scheduling for that specific time frame.I just ordered 1 week ago a Red 2.7L Lariat FX4. Not sure what to expect now. I dont see any mention of 2.7l constraint, but does this mean they are only scheduling Raptors right now?
Order banks close end of this month for normal Rangers. 25 announcement is end of this month.Ordered mine June 21st. A Lariat 2.7 with tow package. Still no date. After reading here about priority codes I discovered that mine was 16. Dealer claims he changed it after ordering. I have my doubts.
Here is his response:
Just checked...your Priority Code was changed when you ordered...we're all set there.
You are one of eight 2024 Ranger Lariat units we are awaiting to be picked up for production from S******* Ford. A Fall build does not necessarily mean the vehicle will depreciate quicker as we have no information available yet on 2025 Rangers...specs, trim levels, etc....so would expect the Order Banks will stay open at least a few more months....but would not expect NEW 2025 units until Spring 2025, at the earliest.
Stay the course....the Lariats have more technology, etc. and guessing that's what holding these units up.
Fingers crossed they'll be good news soon!